Plumbing Rough-In Guide for Australian Steel Frame Kit Homes

Introduction

Embarking on an owner-builder journey in Australia, especially with a steel frame kit home, is a significant undertaking. Among the myriad of critical stages, the plumbing rough-in phase stands as one of the most vital, foundational, and often complex. This detailed guide is meticulously crafted for intermediate-level Australian owner-builders, aiming to demystify the plumbing rough-in process, ensuring compliance with stringent Australian regulations, and providing practical, actionable insights specifically for steel frame kit homes. A successful rough-in is paramount; it determines the functionality, efficiency, and longevity of your home's water supply, drainage, and sanitary systems. Mistakes made at this stage are not only costly to rectify but can also lead to significant structural issues, water damage, and health hazards down the line. We will delve into the regulatory landscape, Australian Standards, state-specific requirements, and the unique considerations when integrating plumbing into high-strength, lightweight steel frames like those manufactured from TRUECORE® steel.

This guide will equip you with the knowledge to confidently plan, supervise, and even undertake aspects of your plumbing rough-in, understand when to engage licensed professionals, and navigate the inspection process. Our goal is to empower you to achieve a durable, compliant, and efficient plumbing system for your steel frame kit home.

Understanding the Basics

Before delving into the intricate details, it's crucial to establish a foundational understanding of what plumbing rough-in entails and the terminology used. 'Rough-in' refers to the installation of all water supply and drainage pipes that will eventually be concealed within walls, floors, and ceilings, before the installation of wall linings (plasterboard, panelling), insulation, or concrete slabs.

Key Plumbing Systems

Your home's plumbing comprises several interconnected systems:

  1. Water Supply (Potable Water): Delivers clean drinking water from the mains connection or rainwater tanks to all fixtures (taps, toilets, showers, hot water systems, appliances).
  2. Sanitary Drainage (Sewerage/Waste Water): Collects wastewater from toilets, sinks, showers, baths, and washing machines, directing it to the septic system or municipal sewer.
  3. Stormwater Drainage: Manages rainwater runoff from roofs, balconies, and other hard surfaces, directing it to storm drains or stormwater retention systems.
  4. Hot Water System (HWS) Connection: Involves specific pipework for hot water generation and distribution.

Rough-In Components

  • Pipework: This includes copper, PEX (cross-linked polyethylene), PVC (polyvinyl chloride) for drainage, and increasingly, crimped or push-fit systems.
  • Fittings: Elbows, tees, couplings, reducers, and other connectors to assemble pipe runs.
  • Valves: Isolation valves, stopcocks, pressure limiting valves (PLVs), and tempering valves.
  • Insulation: Thermal insulation for hot water pipes and sometimes cold water pipes to prevent condensation.
  • Pipe Supports and Fixings: Brackets, clips, and hangers to secure pipes firmly within the steel frame.
  • Backflow Prevention Devices: Essential to prevent contaminated water from re-entering the potable water supply.
  • Floor Wastes: Drains installed in bathrooms, laundries, and other wet areas to manage spills or leaks.
  • Toilet Pans and Cisterns (Temporary): While the final fixtures are installed later, the pan collar and cistern connections are roughed-in.

Timing of Rough-In

The plumbing rough-in typically occurs after the steel frame is erected, roof is installed, and external wall cladding is nearing completion (to provide weather protection), but before internal wall linings. This sequence allows plumbers clear access to the framing elements. It often runs concurrently with electrical rough-in and HVAC ductwork installation.

Owner-Builder Tip: Coordinate closely with your electrician and HVAC technicians. Running services through the same stud cavities or floor joists requires careful planning to avoid conflicts and maintain structural integrity of the steel frame. Prioritise major penetrations for services that cannot be easily rerouted.

Australian Regulatory Framework

Compliance with Australia's building codes and standards is non-negotiable for owner-builders. The primary regulatory document governing plumbing is the National Construction Code (NCC), specifically Volume Three – Plumbing Code of Australia (PCA).

National Construction Code (NCC) Volume Three – PCA

NCC 2022, Volume Three (Plumbing Code of Australia) sets out the technical provisions for the design, construction, and performance of plumbing and drainage systems. It contains requirements for water services, sanitary plumbing and drainage, stormwater drainage, and hot water systems. Performance requirements are the overarching objective, while 'Deemed-to-Satisfy' (DtS) provisions offer a clear path to compliance by meeting specific prescriptive requirements.

Key areas within the PCA relevant to rough-in:

  • Part E1 – Water Services: Covers connection to water mains, pipe sizing, pressure and flow rates, backflow prevention, and water meter placement.
    • NCC E1.3 requires the water service to be capable of supplying water at appropriate pressures and flow rates to all fixtures. Pipe sizing is critical and often determined by AS/NZS 3500.1.

  • Part E2 – Sanitary Plumbing and Drainage: Addresses the design of gravity and pumped sanitary drainage systems, ventilation pipes, traps, and connections to fixtures. This is crucial for preventing sewer gas entry and ensuring efficient waste removal.
    • NCC E2.1 & E2.2 outline performance requirements for sanitary drainage, ensuring it conveys effluent and waste in a safe and hygienic manner. Ventilation pipe sizing and location are crucial elements for proper trap seal protection.

  • Part E3 – Stormwater Drainage: Pertains to roof drainage, subsoil drainage, and surface drainage to prevent water ingress and erosion.
    • NCC E3.1 & E3.2 cover the performance requirements for stormwater drainage, ensuring adequate capacity to remove stormwaters and protect the building from dampness.

  • Part E4 – Hot Water Systems: Details installation requirements, tempering valves, and energy efficiency considerations.
    • NCC E4.3 mandates the installation of tempering valves on hot water outlets supplying bathing and showering facilities in residential buildings to prevent scalding. The maximum water delivery temperature is typically 50°C.

Australian Standards (AS/NZS)

The NCC frequently references specific Australian Standards, which provide detailed technical specifications for plumbing practices:

  • AS/NZS 3500: Plumbing and Drainage Series: This is the cornerstone of Australian plumbing. Owner-builders should be familiar with:
    • AS/NZS 3500.1: Water Services: Covers pipe sizing, materials, jointing, backflow prevention, and installation of water supply systems.
    • AS/NZS 3500.2: Sanitary Plumbing and Drainage: Details requirements for sanitary stacks, floor wastes, traps, ventilation, and connection to sewers/septic tanks.
    • AS/NZS 3500.3: Stormwater Drainage: Specifies requirements for roof gutters, downpipes, stormwater pits, and underground drainage for rainwater runoff.
    • AS/NZS 3500.4: Heated Water Services: Covers the installation and commissioning of hot water systems, including tempering valve requirements.
  • AS 1428.1: Design for access and mobility - General requirements for access - New building work: Relevant if your home is designed for accessibility, affecting fixture heights and clearances.
  • AS 5601.1: Gas installations – General installations: If your home includes gas appliances, this standard governs gas piping installation, which often runs concurrently with plumbing rough-in.

State-Specific Variations and Regulatory Bodies

While the NCC is national, states and territories have their own plumbing regulations and licensing requirements. It is critical to check your specific state's plumbing legislation, as only licensed plumbers are permitted to perform regulated plumbing work in Australia.

  • NSW: NSW Fair Trading regulates plumbing and drainage work. All 'regulated' plumbing work must be done by a licensed plumber and requires a Certificate of Compliance (or a Notice of Work).
    • Regulatory Body: NSW Fair Trading
  • QLD: The Queensland Building and Construction Commission (QBCC) regulates plumbing and drainage work. All plumbing work must be performed by a licensed plumber and requires a Form 4 – Notification of Plumbing and Drainage Work.
    • Regulatory Body: Queensland Building and Construction Commission (QBCC)
  • VIC: Victorian Building Authority (VBA) regulates plumbing work. All plumbing work must be performed by a licensed plumber and requires a Compliance Certificate (or a Notice of Intention to Carry Out Plumbing Work).
    • Regulatory Body: Victorian Building Authority (VBA)
  • WA: Building and Energy (Department of Mines, Industry Regulation and Safety) regulates plumbing. All plumbing work must be carried out by a licensed plumber and requires a Notice of Intent to Commence Plumbing Work.
    • Regulatory Body: Building and Energy, Department of Mines, Industry Regulation and Safety (DMIRS)
  • SA: Office of the Technical Regulator (OTR) within the Department for Energy and Mining oversees plumbing. All plumbing work must be carried out by a licensed plumber and requires an application to the OTR.
    • Regulatory Body: Office of the Technical Regulator (OTR)
  • TAS: Consumer, Building and Occupational Services (CBOS) regulates plumbing. All plumbing work must be carried out by a licensed plumber and requires a Plumbing Permit and a Certificate of Compliance.
    • Regulatory Body: Consumer, Building and Occupational Services (CBOS)

Owner-Builder Responsibility: As an owner-builder, you are legally responsible for ensuring all plumbing work is performed by appropriately licensed tradespeople and complies with all relevant regulations and standards. You will need to submit applications for plumbing permits and arrange for mandatory inspections.

Step-by-Step Process for Plumbing Rough-In

The following steps outline a general sequence for plumbing rough-in within a steel frame kit home construction project. Close coordination with your licensed plumber is essential throughout.

Step 1: Planning and Design (Prior to Construction)

  1. Review Architectural and Plumbing Plans: Thoroughly understand the location of all fixtures, hot water systems, outdoor taps, floor wastes, and the proposed pipework routes. Ensure these align with your steel frame designs.
  2. Consult with a Licensed Hydraulic Consultant/Plumber: For complex designs or large homes, engage a hydraulic consultant. For simpler kit homes, a qualified plumber can design and certify the plumbing system. They will perform calculations for pipe sizing, flow rates, and drainage gradients according to AS/NZS 3500.
  3. Site Services Connection: Confirm the location of the mains water connection point, sewer connection point (or septic tank location), and stormwater discharge point. Understand the requirements for trenching and connection fees.

Step 2: Pre-Slab Rough-In (for Slab-on-Ground Construction)

This crucial stage occurs before your concrete slab is poured. Accuracy here is paramount as corrections are extremely difficult and costly.

  1. Excavation for Under-Slab Drainage: Trenches are dug for main drainage lines. Ensure correct falls (gradients) for gravity drainage, typically 1:60 to 1:100 for DN100 (100mm diameter) pipes, as per AS/NZS 3500.2.
  2. Installation of Sleeves for Services: Where water supply pipes, electrical conduits, or gas lines will penetrate the slab, appropriate sleeves (e.g., PVC pipe) are installed and secured to prevent concrete crushing the services.
    • Steel Frame Tip: Ensure careful coordination of under-slab penetrations with your steel frame hold-down bolts and slab edge rebate details. Avoid direct conflicts with column base plates or wall track locations.

  3. Drainage Pipe Laying: Lay all under-slab sanitary and stormwater drainage pipes (PVC) according to the plumber's design. Ensure all joints are solvent-welded correctly and pipes are adequately bedded in sand or aggregate, and firmly supported to prevent movement during the slab pour.
  4. Stub-Ups: Vertical pipes (stub-ups) are extended from the under-slab drainage to the exact locations of future floor wastes, toilets, and showers. These must be precisely positioned and secured.
  5. Water Supply & Electrical Conduits (Under-Slab): Where required, run water supply pipes (e.g., PEX in conduit or copper) and electrical conduits horizontally under the slab to designated fixture locations or a central service hub.
  6. Inspection 1: Under-Slab Drainage Inspection: Your local council or private certifier will conduct a mandatory inspection of all under-slab drainage pipework before backfilling and slab pouring. This typically involves a hydrostatic test to check for leaks.

Step 3: Above-Slab and Wall Rough-In (Concurrent with Framing)

This stage occurs after the slab is cured and the steel frame is erected, roof on, and partially clad.

  1. Layout and Marking: The licensed plumber collaborates with the builder (you) to mark precise locations for all fixture points, pipe runs, and penetrations on the steel frame. Check these against plans and ensure accessibility.
  2. Penetrations through Steel Framing:
    • TRUECORE® Steel Frames: Steel frames, such as those made from TRUECORE® steel, often come with pre-punched service holes. Utilise these where possible. If additional penetrations are needed, these must be within specified limits to maintain structural integrity. Your steel frame supplier manual (e.g., BlueScope Steel technical manual) will detail allowable hole sizes, locations, and reinforcing requirements.

    • Wall Studs: Avoid cutting or drilling through the flanges (edges) of galvanised steel studs. Holes typically pass through the web (centre) of the stud. Maximum hole sizes and minimum distances from edges/other holes will be specified. Over-drilling or large holes require remedial strapping or blocking, which can be costly and time-consuming.
    • Floor Joists/Bearers: For multi-storey homes or suspended floors, penetrations through steel joists must be carefully planned and executed. Always consult your structural engineer for any significant penetrations through primary structural members.
  3. Water Supply Pipework:
    • Run hot and cold water pipes from the main entry point (and hot water system location) to each fixture. PEX pipework is increasingly popular due to its flexibility, ease of installation, and fewer joints but requires specific crimping or push-fit tools. Copper remains a robust option.
    • Install isolation valves for individual fixtures (e.g., under sinks, behind toilets).
    • Install pressure limiting valves (PLVs) if mains pressure exceeds 500 kPa, usually near the water meter, as per AS/NZS 3500.1. A pressure gauge may be installed to confirm readings.
    • Install tempering valves on hot water lines supplying bathrooms and anywhere scalding is a risk, ensuring maximum outlet temperature of 50°C (as per NCC E4.3 and AS/NZS 3500.4).
  4. Sanitary Drain Pipework:
    • Extend vent pipes from under-slab drainage systems upwards through wall cavities and roof space, terminating above the roof line at specific heights/distances from windows/openings (AS/NZS 3500.2).
    • Install branch lines for toilets, showers, baths, basins, and laundries, ensuring correct falls and trap installation.
    • Connect floor wastes in wet areas. Ensure correct waterproofing details are considered around these penetrations.
  5. Stormwater Downpipes: Install downpipes from gutters, connecting them to the sub-surface stormwater drainage system.
  6. Hot Water System Installation Prep: Install pipework for the hot water system's inlet, outlet, and pressure relief valve (PRV) drain. Ensure PRV drains comply with AS/NZS 3500.4 regarding discharge points.
  7. Pipe Support and Protection:
    • Secure all pipes to the steel framing using appropriate clips and brackets at specified intervals (e.g., every 600-900mm for vertical runs, 1.2-1.8m for horizontal runs, as per AS/NZS 3500). Avoid rigid clamping that could lead to pipe abrasion against steel.
    • Protect pipes from nails/screws during subsequent cladding stages by installing steel nail plates over pipe runs crossing studs/noggins, especially in accessible areas.
    • TRUECORE® Steel Frames: The rigid nature of steel frames requires careful consideration of thermal expansion and contraction for pipes. Ensure adequate pipe clearances within pre-punched holes and use flexible pipe clips where appropriate to allow for minor movement without stressing joints.

  8. Insulation: Insulate hot water pipes within wall cavities and roof spaces to conserve energy. Consider insulating cold water pipes in areas prone to condensation or to reduce noise.

Step 4: Testing and Inspection (Prior to Wall Linings)

  1. Pressure Testing: The plumber will perform a hydrostatic pressure test on the water supply lines. The system is filled with water and pressurised to a specified level (e.g., 1.5 times working pressure, held for an hour) to detect any leaks before internal linings are installed. This is critical.
  2. Drainage System Test: Drainage systems are also tested, often by filling with water or conducting a smoke test to check for integrity and correct falls.
  3. Inspection 2: Rough-In Inspection: Your local council or private certifier will conduct a mandatory rough-in inspection. All pipework must be visible, accessible, and correctly installed before it is covered.

WHS Warning: During pressure testing, exercise extreme caution. High pressures can cause pipes or fittings to burst, potentially causing serious injury. Ensure the area is clear and follow the plumber's instructions.

Practical Considerations for Kit Homes

Steel Frame Specific Challenges and Solutions

  • Pre-Punched Service Holes: Most reputable steel frame kit home suppliers (e.g., those using TRUECORE® steel from BlueScope Steel) design their frames with pre-punched service holes in wall studs and sometimes trusses/joists. These are strategically placed to accommodate common electrical and plumbing services. Always utilise these first.
    • Solution: Coordinate your plumbing layout with the pre-punched hole locations. Provide your plumber with the framing plans detailing these holes in advance.
  • Rigidity of Steel: Steel frames are rigid and do not flex like timber. This means:
    • Penetrations: Any additional penetrations must be carefully located and sized according to the steel frame manufacturer's guidelines. Never cut major structural elements without engineer approval!
    • Pipe Movement: Thermal expansion and contraction of pipes (especially hot water) can lead to noise or stress on rigid steel frames. Use resilient pipe clips, sleeves, and ensure adequate clearance in penetrations.
    • Acoustics: Steel can transmit sound readily. Insulate pipes, especially drainage, running through living areas within wall cavities, to minimise noise transmission.
  • Condensation: In certain climates or under specific conditions, steel frames can be prone to condensation if not properly insulated, which can impact pipework.
    • Solution: Ensure all pipes, especially cold water lines running through roof spaces or unconditioned areas, are adequately insulated.
  • Corrosion Protection: Galvanised steel frames offer good corrosion resistance. However, aggressive chemicals (e.g., some pipe joint compounds, certain types of fire retardants) or persistent moisture can cause issues. Ensure materials that come into contact with the steel frame are compatible.
    • Solution: Use compatible fasteners and pipe clips. Ensure any spills of corrosive chemicals are promptly cleaned. Always ensure proper drainage to prevent water pooling within cavities.

Material Selection and Best Practices

  • Pipes:
    • Copper: Durable, traditional, good for hot water. More expensive, requires soldering.
    • PEX: Flexible, cost-effective, fewer joints, fast installation with crimp or push-fit systems. Can be damaged by UV light, typically requires protective conduit.
    • PVC: Standard for drainage, cost-effective. Not suitable for pressure applications.
  • Fittings: Use high-quality brass or approved plastic fittings. Ensure compatibility with pipe material.
  • Waterproofing Integration: Close coordination with your waterproofer is essential, especially in wet areas (bathrooms, laundries). Ensure all floor penetrations (floor wastes, tap spindles) are properly sealed and integrated with the waterproofing membrane before tiling.
  • Future Access: Where possible, plan for future access to critical valves or inspection points (e.g., access panels for shower mixers). This can save considerable cost and damage during future maintenance.

Cost and Timeline Expectations

Estimating plumbing rough-in costs and timelines can vary significantly based on location, home size, number of fixtures, and complexity. The figures provided below are indicative for an average 3-4 bedroom, 2-bathroom steel frame kit home in Australia (2024).

Costs (AUD, excluding fixtures)

Item Estimated Cost (AUD) Notes
Licensed Plumber Fees $8,000 - $20,000 Covers labour and materials for rough-in, pressure tests, compliance. May increase for complex designs, rural locations, or premium materials.
Hydrostatic/Drainage Testing Included in plumber fees, or a separate charge of $300 - $800 For council/certifier inspection.
Application/Permit Fees $400 - $1,000 Varies by state/council. Covers plumbing permit and inspections.
Mains Water Connection Fee $500 - $3,000 Connection to utility. Can be higher for new subdivisions or remote locations.
Sewer Connection Fee $1,000 - $10,000 Varies significantly based on distance to sewer main, complexity, and utility charges.
Septic System Installation $8,000 - $25,000 If not connected to mains sewer. Excludes ongoing maintenance.
Water Tank & Pump Installation $2,000 - $8,000 If integrating rainwater harvesting.
Hot Water System (Supply only) $1,000 - $4,000 Price varies for electric, gas instantaneous, or heat pump systems.
Additional Earthworks $500 - $2,000 For trenching to mains services if significant distance.
TOTAL ROUGH-IN (Plumber + Permits/Basic Connections)
$10,000 - $35,000+

Cost-Saving Tip: Consolidate wet areas (bathrooms, laundry, kitchen) to reduce pipe runs and complexity, thereby lowering labour and material costs. Using a single wet wall can be highly efficient for a kit home design.

Timeline

The plumbing rough-in phase for an average kit home typically takes:

  • Pre-Slab Drainage: 2-5 days (including trenching, laying, and inspection preparation).
  • Above-Slab/Walls Rough-in: 5-10 days (for a single plumber and/or apprentice, spread over weeks depending on structure and other trades).
  • Inspections: Allow 1-2 days lead time for booking and waiting for the inspector.

Total active plumbing rough-in time: 7-15 working days spread over a few weeks.

Owner-Builder Time Management: Factor in lead times for plumber availability, materials delivery, council inspections, and coordination with other trades. Delays in one area will inevitably impact subsequent stages.

Common Mistakes to Avoid

Owner-builders, despite their best intentions, can fall victim to common pitfalls during the plumbing rough-in. Awareness is the first step to avoidance.

  1. Failure to Engage Licensed Professionals: This is the most critical mistake. In Australia, regulated plumbing work must be done by a licensed plumber. Attempting DIY plumbing can void your insurance, lead to non-compliance, costly rectification orders, and potential health hazards. It simply isn't worth the risk.
    • Consequence: Non-compliance, hefty fines, demolition of non-compliant work, voided warranty/insurance.
  2. Inadequate Planning and Coordination: Rushing the design or failing to coordinate plumbing with electrical, HVAC, and steel frame details.
    • Consequence: Conflicts in service runs, additional costly penetrations in steel frames, structural compromises, delays.
  3. Incorrect Pipe Sizing and Gradients: Undersized water pipes lead to poor water pressure; incorrect drainage pipe gradients lead to blockages or slow drainage.
    • Consequence: Poor fixture performance, recurrent blockages, potential for sewer gas entry, non-compliance.
  4. Neglecting Backflow Prevention and Tempering Valves: Failure to install these critical devices where required.
    • Consequence: Contaminated potable water supply (health risk), scalding (safety risk), non-compliance.
  5. Insufficient Pipe Support and Protection: Pipes not properly secured or protected against future penetrations.
    • Consequence: Noisy pipes (water hammer), pipe damage from nails/screws during subsequent stages, loose pipes leading to leaks over time.
  6. Ignoring State/Local Regulations: Assuming national consistency without checking local council or state-specific plumbing rules.
    • Consequence: Delayed inspections, rectification orders, fines, project setbacks.
  7. Poor Under-Slab Penetration Layout: Incorrectly placed stub-ups for toilets, showers, or floor wastes.
    • Consequence: Extremely costly and difficult to rectify once the slab is poured, potentially requiring jackhammering.
  8. Lack of Pressure Testing: Not conducting hydrostatic tests on water lines before covering them.
    • Consequence: Undetected leaks within wall cavities can cause severe water damage, mould, and structural compromise long after the build is complete.

When to Seek Professional Help

While owner-builders can project manage and even perform some minor non-regulated tasks (like digging trenches under supervision), a licensed plumber is legally required for all 'regulated' plumbing work in Australia. Beyond legal requirements, there are specific scenarios where professional consultation and execution are absolutely essential:

  • Design and Consultation: Engagewith a licensed plumber or hydraulic consultant at the design phase to review plans, calculate pipe sizes, and ensure compliance with AS/NZS 3500 and NCC.
  • All Regulated Plumbing Work: This includes:
    • Connection to mains water or sewer.
    • Installation of all water supply pipes (hot and cold).
    • Installation of all sanitary drainage pipes (waste and vent).
    • Installation of all stormwater drainage pipes.
    • Installation of hot water systems, tempering valves, and pressure limiting valves.
    • Installation of backflow prevention devices.
    • Work on gas lines (requires a licensed gas fitter, often a dual-licensed plumber/gas fitter).
  • Interactions with Structural Elements: Any proposed penetrations or modifications to load-bearing steel frame members that are not specifically detailed in the kit home manufacturer's manual or exceed their guidelines. This requires review by a structural engineer.
  • Complex Systems: For hydronic heating, greywater recycling, or large commercial-grade systems, a specialist hydraulic consultant is invaluable.
  • Mandatory Inspections: Your licensed plumber will typically handle the arrangements for the pre-slab and rough-in inspections, but you, as the owner-builder, are responsible for ensuring they are conducted and passed.

Safety First: Never attempt to alter gas lines or high-pressure water systems without the explicit involvement of relevant licensed professionals. The risks of explosions, leaks, or scalding are severe and potentially lethal.

Checklists and Resources

Owner-Builder Plumbing Rough-In Checklist

Pre-Construction Planning:

  • Finalised plumbing plans (stamped by a licensed plumber).
  • Reviewed steel frame manufacturer's guidelines for penetrations.
  • Checked state/local council plumbing regulations and permit requirements.
  • Applied for and obtained necessary plumbing permits (NSW: Notice of Work, QLD: Form 4, VIC: Notice of Intention, WA: Notice of Intent, SA: Application to OTR, TAS: Plumbing Permit).
  • Contracted a licensed plumber for all regulated work.
  • Coordinated plumbing layout with electrical and HVAC plans.

Pre-Slab Rough-In:

  • Trenching for under-slab drainage completed with correct falls.
  • Sleeves installed for slab penetrations (water, electrical, gas).
  • Under-slab drainage pipes laid, jointed, and supported correctly.
  • Stub-ups for floor wastes and toilets accurately positioned and secured.
  • Water supply lines and conduits run under-slab where required.
  • Arranged and passed mandatory under-slab drainage inspection.

Above-Slab / Wall Rough-In:

  • Plumber has marked all fixture locations and pipe runs on the steel frame.
  • Water supply pipes (hot and cold) installed to all fixtures.
  • Sanitary drainage and vent pipes installed with correct falls and termination.
  • Hot water system connections roughed-in.
  • Tempering valves and pressure limiting valves installed as required.
  • Backflow prevention devices installed as required.
  • All pipes adequately supported and protected with nail plates.
  • Hot water pipes insulated.
  • Downpipes installed and connected to stormwater drainage.
  • Coordinated wet area waterproofing details with plumber and waterproofer.

Testing and Inspection:

  • Water supply lines pressure tested with no leaks detected.
  • Drainage lines tested for integrity.
  • Arranged and passed mandatory rough-in plumbing inspection.
  • Obtained Certificate of Compliance/Plumbing Certificate from the licensed plumber.

Useful Resources & Contacts

  • National Construction Code (NCC): Access via ABCB website (registration required for free access).
  • AS/NZS 3500 Plumbing and Drainage: Purchase directly from Standards Australia.
  • BlueScope Steel & TRUECORE® Steel: Technical manuals and installation guides for steel framing.
  • Your State's Plumbing Regulatory Body: (Refer to state-specific bullet points in 'Australian Regulatory Framework' above).
  • Local Council Building Department: For specific local requirements, permits, and inspection bookings.
  • Licensed Plumbers: Use industry associations like Master Plumbers Australia or Plumbing & Drainage Contractors Association for finding reputable tradespeople.

Key Takeaways

The plumbing rough-in is a mission-critical phase for any owner-builder, particularly with the distinct considerations of a steel frame kit home. The core principles of success revolve around meticulous planning, strict adherence to the NCC and AS/NZS 3500, and critically, the mandatory engagement of licensed plumbing professionals. For steel frame homes, understanding how to work with pre-punched holes in TRUECORE® steel, managing penetrations, and addressing potential acoustic or condensation issues are vital. Proactive coordination with your steel frame supplier and other trades will prevent costly conflicts. By diligently following this comprehensive guide, performing all relevant inspections, and prioritising safety and compliance, you will lay a robust, long-lasting foundation for your home's water, waste, and storm management systems, ensuring your owner-builder journey results in a successful and compliant dwelling.